John Bowen
Proven Experience

John Bowen
- Conducted oversight of M&O contractors through detailed surveillances, assessments, and field activities for major DOE programs, including the Uranium Processing Facility (UPF) and the Outfall 200 Mercury Treatment Facility.
- Established and managed robust Field Quality Control programs for the UPF in accordance with NQA-1 requirements across multiple disciplines (Civil, Mechanical, Electrical, Welding, M&TE, Material Receiving).
- Direct working experience and application of major industry standards, including ASME B31.1, B31.3, ASME Section III pressure piping, ASME Section VIII pressure vessels, API 650, and API 653.
- Managed UPF’s Non-Conformance Program as Validating Authority for Non-Conformance Reports (NCRs) and served as a Board Member for the project’s Issues Management Team.
- Project Leadership: Managed logistics, staffing, and performance expectations for teams of up to 30+ personnel across multi-state and international projects.
- Technical Inspection: Performed and managed teams for various inspections and testing, including welding, mechanical, structural steel, anchor bolt/grout, hydrostatic/pneumatic pressure tests, and Non-Destructive Evaluation (NDE) techniques (MT, PT, UT shear wave, RT, ET).
- Regulatory Turnover: Responsible for the review and stamping of all ASME Section III systems and managing N-5 Code data reviews and approvals for turnover to the client during nuclear power project completion.
Sustainable Results
- Managed the UPF’s Non-Conformance Program as the Validating Authority for Non-Conformance Reports (NCRs). His team was crucial in identifying negative NCR trends and advancing them to the Issues Management (IM) Team for root cause analysis and ultimate programmatic resolution.
- Implemented a robust Quality Control Certification Program for team members at UPF, guaranteeing the team met project-specific QC goals. Additionally, he has successfully trained and tested QC personnel and new Welding Inspectors.
- Verified the implementation of all applicable NQA-1 requirements on a multi-year nuclear completion project. Developed Operations Quality Control Manuals and performed cross-walks of site procedures to Standard Work Process Procedures (SWPP).